Sl.No |
Details Of Work |
Actual Amount |
Date of Completion |
2006-2007 |
1 |
Providing addition and alteration works in MBA department building. |
125949.00 |
28.09.2006 |
2 |
Laying of flooring tiles and providing of tiles on the wooden work table for MSc laboratory in the Chemistry department. |
115765.00 |
15.09.2006 |
3 |
Providing colour washing to the main entrance and staircase portion in the main building. |
79737.00 |
14.08.2006 |
4 |
Providing colour washing and painting the doors and windows in the Central workshop building in Mechanical department. |
39841.00 |
26.08.2006 |
5 |
Providing OBD painting to the old and new walls in the developed portion in MBA department building. |
23472.00 |
10.10.2006 |
6 |
Laying of flooring tiles and cuddapah slab in the office room and providing PVC edge protector for the addition wooden work table in the MSc Lab in the Chemistry department. |
20363.00 |
20.11.2006 |
7 |
Providing cubicle arrangement for faculty at 2nd floor of Computer Science and Engineering department building. |
160760.00 |
15.12. 06 |
8 |
Providing ramp to facilitate entry for physically handicapped person in the main building and department of Humanities and Social Science block. |
101446.00 |
29.12.2006 |
9 |
Renovation of gent’s toilet near of the main entrance in the main building. |
170076.00 |
02.01.2007 |
10 |
Providing addition and alteration in the Electrical works in Central workshop building in Mechanical Engineering department. |
85460.00 |
29.12.2006 |
Total amount Rs |
9,22,869.00 |
2007-2008 |
1 |
Carrying outs replacement work of lights which is not working in the main building. |
7210.00
|
- |
2 |
Providing Hollow block compound wall behind the hostel block VII. |
83594.00 |
12.06.07 |
3 |
Providing acoustics wall paneling work ground floor of ECE Department. |
131321.00 |
11.07.07 |
4 |
Providing false ceiling and improvements to the multimedia lab in second floor of Humanities and Social Science Department. |
122603.00 |
26.06.07 |
5 |
Providing power supply, fittings, UPS and Power plugs to multimedia lab in second floor of Humanities and Social Science Department. |
151823.00 |
29.06.07 |
6 |
Providing wall paneling work for entrance at ground floor of main building. |
192903.00 |
04.07.07 |
7 |
Renovation of Conference Hall of main building and providing aluminium partition arrangement of CPDE building. |
178570.00 |
17.07.07 |
8 |
Redesigning of cable trenches in machines lab of Electrical and Electronics Engineering Department building in CEG Campus. |
159318.00 |
27.08.07 |
9 |
Providing cubicle arrangements for faculty room at first floor of Structural Engineering Division. |
192107.00 |
01.08.07 |
10 |
Renovation of class room No.47 & 48 and providing false ceiling in room. No.37 of main building. |
147094.00 |
12.10.07 |
11 |
Supplying and fixing of tube light fittings including wirings in rooms.No.47, 48 & 37 of main building. |
42865.00 |
22.10.07 |
12 |
Providing modification of faculty rooms, research scholar rooms and store room in the ground floor of R & AC division. |
196175.00 |
04.02.08 |
13 |
Providing main water line connection to the sump quadrangle of main building. |
144662.00 |
27.11.07 |
14 |
Providing leak proof treatment with plastic felt in room.No.29 of main building. |
84764.00 |
30.01.08 |
15 |
Renovation and providing electrical fittings including wiring works at AUPPST Centre and Students union room. |
94331.00 |
29.01.08 |
16 |
Renovation work for AUPPST Centre, painting the inside and outside and toilet alteration work and providing to Student union room of main building. |
169421.00 |
11.02.08 |
17 |
Providing cubicle arrangements for Distance Education faculty rooms at first floor of canteen. |
192915.00 |
20.02.08 |
18 |
Providing new electrical work in the Distance Education study centre at first floor of canteen. |
194321.00 |
06.03.08 |
19 |
Providing cubicle arrangements for Distance Education faculty rooms at first floor of canteen. |
180697.00 |
04.03.08 |
20 |
Providing aluminium partition for new class room in PG lab of CWR. |
196049.00 |
22.03.08 |
21 |
Providing road to facilitate entry for Anna University Campus to Old High way Campus. |
164650.00 |
20.02.08 |
22 |
Providing plain cement concrete for link road between Anna University Campus and old high way Campus. |
192426.00 |
12.03.08 |
Total amount Rs |
32,19,819.00
|